Practices, barriers and benefits of risk management process in building services cost estimation

Mok, C K; Rao Tummala, V M and Leung, H M (1997) Practices, barriers and benefits of risk management process in building services cost estimation. Construction Management and Economics, 15(2), pp. 161-175. ISSN 01446193

Abstract

The preparation of cost estimates for construction projects is not an easy job, because construction projects are subject to risks and uncertainties, particularly at the inception stage, when very limited information about the project is available. However, the cost estimates prepared at this stage are usually the most important to the client. Nowadays, the costs for building services installations contribute a significant share of the total construction cost of building projects. Thus the accuracy of the building services cost estimates plays an important role in the total building construction project cost estimates. Traditionally, building services cost estimates are prepared by a deterministic single-figure (most likely) approach. This approach is often cost-ineffective and reactionary in nature. The risk management process (RMP) provides a logical consistent framework in identifying the risk factors affecting costs and in making allowances for risks in cost estimation. A survey was conducted to find out the current building services cost estimation practices and to obtain an insight into the understanding, use and application of RMP in preparing building services cost estimates within the building services industry. The results of the survey have suggested that the traditional deterministic cost estimation method is still being adopted by the majority of building services engineers in preparing cost estimates. Also, RMP has not been widely adopted by the building services industry in Hong Kong. From the analysis of building services firms and engineers with regard to the critical success factors for implementation of risk management, the survey reflects that the potential of implementing RMP for building services cost estimation is high.

Item Type: Article
Uncontrolled Keywords: building services; cost; estimating; risk; uncertainty
Index terms: construction project, critical success factor, estimating, cost estimating, building construction, project cost, survey, accuracy, risk factor, building services engineer, risk management, cost estimate, estimate, implementation, Hong Kong, building service, engineer, construction cost
Subjects: economics, professional development, Geography, production management, building construction, environmental hazards, risk assessment, profession, data collection methods, control systems, engineering systems, financial and cost management, contractual arrangements
Topics: Project Management, Geographical Context, Research Practice, Information Management, Engineering Principles, Cost Management, Construction Technology, Procurement, Sustainability, Roles and Professions, Risk Management
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here