Agapiou, A; Clausen, L E; Flanagan, R; Norman, G and Notman, D (1998) The role of logistics in the materials flow control process. Construction Management and Economics, 16(2), pp. 131-137. ISSN 01446193
Abstract
Frequently, the supply of building materials to the construction site is fraught with difficulties which can have a significant effect on productivity. Major productivity gains are possible, particularly if the building process is planned from a logistics perspective. The concept of logistics was developed initially within the manufacturing industry, and now constitutes an important management tool to ensure an overall strategic perspective on the flow of materials in the production process. This paper contends that logistics are relevant also to the construction industry, and describes the development of a logistics model to manage the flow of materials from suppliers to installation on-site and its application to a Danish house building project. The case study evidence suggests that the primary focus of the logistics concept in construction is to improve coordination and communication between project participants during the design and construction phases, particularly in the materials flow control process. The logistics concept requires accurate scheduling of materials to programmed delivery dates keyed to actual site layout and storage arrangements. The logistics approach also involves a new role for materials suppliers, including early involvement in the design phase and overall responsibility for the flow of information relating to materials.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | Denmark; house building; logistics; materials flow control |
| Index terms: | production process, manufacturing industry, construction site, scheduling, site layout, materials flow, Denmark, building process, evidence, productivity, case study, coordination, construction industry, design and construction, building material, design phase |
| Subjects: | data collection methods, evaluation and assessment methods, site logistics, contractual arrangements, professional practice, operations research, work location, building materials, material science and engineering, Geography, management, manufacturing engineering, industry analysis, building construction |
| Topics: | Procurement, Engineering Principles, Construction Materials, Research Practice, Geographical Context, Business Strategy, Time Control, Organizational Design, Site Management, Design Practice |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here