Hierarchical indices for measuring the effectiveness of construction automation implementation

Wang, C H; Wang, M W and Huang, Y C (1998) Hierarchical indices for measuring the effectiveness of construction automation implementation. Construction Management and Economics, 16(3), pp. 257-267. ISSN 01446193

Abstract

The construction industry in Taiwan is reaching the turning point of industry upgrade and is confronted by such problems as slow productivity growth; increases in labour costs, and awareness of environmental protection requirements. In addition, Taiwan is vigorously preparing to join the World Trade Organization (WTO), and the Agreement on Government Procurement will be signed. Then the market of local public works will be able to be opened. After Taiwan has joined the WTO, local contractors will no longer enjoy special protection, and will compete with foreign contractors on equal grounds. To address these problems, Taiwan is launching the first phase of a construction automation plan (1990-2000), trying to assist local contractors in boosting their global competitiveness through automation. This paper establishes a Taiwanese approach to measuring the overall effectiveness of automation implemented in the construction industry in Taiwan. With this approach, 30%, 71% and 94% increases in commitment aspects and 15%, 20% and 24% increases in benefit aspects have been achieved from 1991 to 1993 (taking 1990 as the base year): significant improvements after the launch of the construction automation plan. The effectiveness of the commitment aspects, however, is far greater than that of the benefit aspects.

Item Type: Article
Uncontrolled Keywords: construction automation; effectiveness; Taiwan; world trade organization
Index terms: commitment, foreign contractor, Taiwan, environmental protection, local contractor, productivity, government procurement, World Trade Organization, automation, construction industry, implementation, labour cost, public work, competitiveness, effectiveness
Subjects: business, practitioner, psychology, institutional frameworks, contractual arrangements, performance management, management, infrastructure engineering, automation and robotics, Geography, market analysis, cost management, environmental engineering, industry analysis, procurement strategy
Topics: Digital Applications, Quality Management, International Construction, Organizational Design, Business Strategy, Research Practice, Geographical Context, Engineering Principles, Roles and Professions, Procurement, Sustainability, Governance
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here