Modelling information flow during the conceptual and schematic stages of building design

Baldwin, A N; Austin, S A; Hassan, T M and Thorpe, A (1999) Modelling information flow during the conceptual and schematic stages of building design. Construction Management and Economics, 17(2), pp. 155-167. ISSN 01446193

Abstract

This paper reports on recent research the aim of which was to study, model and simulate the information flow at the conceptual and schematic stages of building design. The development of a generic model of the conceptual and schematic design process for buildings is described. This model comprising design tasks and their information requirements was produced using data flow diagrams. Examples from several levels of the model are provided. Details are then given as to how the model may be used to assist the management of the design process both directly and by providing primary data for other tools and techniques. Industry feedback on the data modelling and these tools and techniques is then discussed. It is concluded that it is only by a better understanding of the flow of information among project participants that the management of design may be improved, and that although the generic data flow model provides immediate benefits to design managers these can be enhanced greatly by the use of the model as a primary data source for other tools and techniques including the design structure matrix and simulation.

Item Type: Article
Uncontrolled Keywords: conceptual and schematic design; data flow diagrams; design structure matrix; information flow; simulation
Index terms: design manager, design process, information flow, design structure matrix, building design, modelling, data modelling
Subjects: data science, architectural design, analytical methods, profession, design methods, information systems
Topics: Roles and Professions, Engineering Principles, Design Practice, Digital Applications
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here