Bee-Hua, G (1999) An evaluation of the accuracy of the multiple regression approach in forecasting sectoral construction demand in Singapore. Construction Management and Economics, 17(2), pp. 231-241. ISSN 01446193
Abstract
In the current state of research in construction demand modelling and forecasting there is a predominant use of the multiple regression approach, particularly the linear technique. Because of the popularity, it may be useful at this stage to gain an insight into the accuracy of the approach by comparing the forecasting performance of different forms of regression analysis. It is only through such formal means that the relative accuracy of different regression techniques can be assessed. In a case-study of modelling Singapore's residential, industrial and commercial construction demand, both linear and nonlinear regression techniques are applied. The techniques used include multiple linear regression (MLR), multiple log-linear regression (MLGR) and autoregressive nonlinear regression (ANLR). Quarterly time-series data over the period 1975-1994 are used. The objective is to evaluate the reliability of these techniques in modelling sectoral demand based on ex-post forecasting accuracy. Relative measures of forecasting accuracy dealing with percentage errors are used. It is found that the MLGR outperforms the other two methods in two of the three sectors examined by achieving the lowest mean absolute percentage error. The general conclusion is that nonlinear techniques are more accurate in representing the complex relationship between demand for construction and its various associated indicators. In addition to improved accuracy, the use of nonlinear forms also expands the scope of regression analysis.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction demand; forecasting accuracy; model evaluation; nonlinear; regression techniques |
| Index terms: | regression analysis, Singapore, commercial construction, accuracy, forecasting, modelling, multiple-regression, construction demand |
| Subjects: | prediction and forecasting, analytical methods, market analysis, professional development, Geography, statistical analysis, construction type |
| Topics: | Engineering Principles, Construction Technology, Research Practice, Information Management, Geographical Context |
| Descriptive scope: | 3 PCA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here