A neural network based system for predicting earthmoving production

Shi, J J (1999) A neural network based system for predicting earthmoving production. Construction Management and Economics, 17(4), pp. 463-471. ISSN 01446193

Abstract

An artificial neural network based system (NN_earth) is developed for construction practitioners as a simple tool for predicting earthmoving opérations, which are modelled by back propagation neural networks with four expected parameters and seven affecting factors. These networks are then trained using the data patterns obtained from simulation because there are insufficient data available from industrial sources. The trained network is then incorporated as the computation engine of NN_earth. To engender confidence in the results of neural computation, a validation function is implemented in NN_earth to allow the user to apply the engine to historic cases prior to applying it to a new project. An equipment database is also implemented in NN_earth to provide default information, such as internal cost rate, fuel cost, and operator's cost. User interfaces are developed to facilitate inputting project information and manipulating the system. The major functions and use of NN_earth are illustrated in a sample application. In practice, NN_earth can assist the user either in selecting a crew to minimize the unit cost of a project or in predicting the performance of a given crew.

Item Type: Article
Uncontrolled Keywords: artificial neural networks; back propagation; earthmoving; prediction; simulation; site operations
Index terms: user interface, unit cost, earthmoving, site operation, computation, default, construction practitioner, back propagation, neural network, validation, artificial neural network, database
Subjects: construction operations, algorithms, dispute resolution, data management, human-computer interaction, modelling and simulation, computational methods, professional development, operations management, financial and cost management, artificial intelligence
Topics: Site Management, Legal Issues, Cost Management, Research Practice, Digital Applications, Engineering Principles, Information Management
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here