Effects of high prequalification requirements

Wei, L; Krizek, R J and Hadavi, A (1999) Effects of high prequalification requirements. Construction Management and Economics, 17(5), pp. 603-612. ISSN 01446193

Abstract

When designing a set of prequalification requirements, the first objective is to select the basic factors that are deemed appropriate to scrutinize, and the second objective is to establish the threshold for each of these factors to evaluate the capability and capacity of the bidders on a given project; together, these factors and the limits imposed on each constitute the basis for qualifying or disqualifying each of the bidders. To obtain the desired prequalification results and the consequent quality delivery of a project, both selecting the factors and determining the limits for each factor are crucial and must be given careful attention with due consideration of the prevailing environment (including market conditions, deadlines, need for technology transfer, etc.). In this study it was found that an improper design of prequalification requirements seriously affected the progress and cost of projects, provided opportunities for collusion, and encouraged the obtaining of contracts through improper practices. Based on an analysis of data from 30 Taipei Mass Rapid Transit projects, together with information gleaned from numerous interviews with contractors, consultants, and clients, it is shown that a risk-taking attitude by the Government and the establishment of relatively low prequalification requirements would be more conducive to achieving a desirable balance among (a) satisfying the schedule and sequence of contracting, (b) obtaining lower prices by an increase in competition, (c) procuring the timely delivery of a quality project, and (d) fostering the growth of local contractors.

Item Type: Article
Uncontrolled Keywords: economic development; government policies; growth of local contractors; prequalification requirements; taipei mass rapid transit
Index terms: competition, technology transfer, local contractor, risk taking, interview, economic development, market condition, collusion, government policy, bidder
Subjects: economic development, tendering, decision-making and reasoning, market analysis, economic and policy analysis, practitioner, data collection methods, knowledge management, bidding, public policy
Topics: Procurement, Sustainability, Governance, Roles and Professions, Research Practice, Engineering Principles
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here