Akintoye, A and Fitzgerald, E (2000) A survey of current cost estimating practices in the UK. Construction Management and Economics, 18(2), pp. 161-172. ISSN 01446193

Abstract

The results are documented of an investigation into current cost estimating practices of contractors for construction projects. A questionnaire survey of contractors was undertaken, in which the respondents are classified into four groups based on their turnover namely: very small, small, medium and large firms. The survey indicates that contractors, irrespective of size, continue to undertake cost estimating predominantly for construction planning purposes, including the preparation of tenders and cost control of projects during the execution stage and, to a lesser extent, for construction project evaluation. Recent developments in cost estimating methods and tools that consider risks and variability in cost estimates, such as the use of range estimating and parametric estimating techniques, have not been adopted by contractors. The practice of cost estimating does not differ from conventional techniques based on the use of labour and material constants to obtain prices for bills of quantities items on an item by item basis. The study shows that the major causes of inaccuracy in cost estimating continue to be the lack of practical knowledge of the construction process by those responsible for the estimating function, insufficient time to prepare cost estimates, poor tender documentation and the wide variability of subcontractors' prices.

Item Type: Article
Uncontrolled Keywords: analysis of variance; cost estimate; estimating techniques; performance appraisal; tendering
Index terms: turnover, cost estimating, documentation, survey, construction project, cost control, construction process, questionnaire, parametric estimating, appraisal, estimating, subcontractor, variance, investigation, bills of quantities, cost estimate, construction planning, variability
Subjects: data collection methods, practitioner, financial and cost management, construction planning, business management, factor and component analysis, professional development, production management, building construction, measurement and scaling, statistical analysis
Topics: Roles and Professions, Business Strategy, Cost Management, Information Management, Project Management, Research Practice, Site Management
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here