A model for predicting plant maintenance costs

Edwards, D J; Holt, G D and Harris, F C (2000) A model for predicting plant maintenance costs. Construction Management and Economics, 18(1), pp. 65-75. ISSN 01446193

Abstract

A model is presented that predicts the total cost of plant maintenance (i.e. direct cost of maintenance plus indirect cost of lost production) and is derived studying a random sample of tracked hydraulic excavators. Analysis is based on the machine history file data of 33 plant items, modelled using multiple regression (MR) analysis. Validation of the model was determined via the combination of an observed high R2 at 0.94 and various statistical tests which confirmed the prerequisites of a rigorous MR analysis. Machine weight, type of industry and company attitude towards predictive maintenance were found to be the best predictor variables of total plant maintenance cost. The paper also discusses reasons underlying the inclusion of predictor variables in the final model, and concludes with clear directions for future research in this field.

Item Type: Article
Uncontrolled Keywords: construction plant; plant downtime; plant maintenance cost; tracked hydraulic excavators
Index terms: maintenance cost, direct cost, validation, statistical test, multiple-regression, hydraulic, indirect cost, construction plant, history, predictive maintenance
Subjects: statistical analysis, cost management, fluid mechanics, financial management, construction equipment, professional development, architectural and construction history, economics, maintenance engineering
Topics: Research Practice, Plant and Equipment, Information Management, Business Strategy, Cost Management, Engineering Principles, Procurement
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here