Quest for continuous quality improvement for public housing construction in Hong Kong

Tam, C M; Deng, Z M; Zeng, S X and Ho, C S (2000) Quest for continuous quality improvement for public housing construction in Hong Kong. Construction Management and Economics, 18(4), pp. 437-446. ISSN 01446193

Abstract

With mandatory implementation of the ISO 9000 quality system by the Housing Authority in Hong Kong, most construction firms there now claim to have initiated quality systems in their processes as defined in their quality manuals. In addition, an objective quality measuring yardstick, the Performance Assessment Scoring Scheme (PASS), has been administered by the Housing Authority of Hong Kong to monitor the performance quality of contractors. These two measures, coupled with the two other contractual requirements stipulating the use of mechanized formwork and precast facade units, are directed towards achievement of a desired quality standard. However, the PASS analysis has revealed that the general level of quality has not improved significantly and the expected continuous improvement in construction quality has not been realized over a specific time period. Quality appears far better on paper than does the actual work on site. This suggests that quality management in the construction setting is far more difficult to achieve than it is in other industries. This paper explores possible reasons for failure in the quest for quality in public housing construction, and proposes changes needed before the vision of continuous quality improvement can be realized.

Item Type: Article
Uncontrolled Keywords: iso 9000; public housing construction; quality assessment; quality management
Index terms: formwork, continuous improvement, quality improvement, Hong Kong, quality standard, implementation, quality management, performance assessment, public housing, quality assessment, construction firm, ISO, housing, construction quality
Subjects: Geography, performance measurement, quality assurance, assessment methods, building construction, organization, construction type, project delivery, contractual arrangements, standards development
Topics: Procurement, Construction Technology, Business Strategy, Geographical Context, Quality Management, Human Resources
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here