McCutcheon, R T (2001) Employment generation in public works: Recent South Africa experience. Construction Management and Economics, 19(3), pp. 275-284. ISSN 01446193
Abstract
Unemployment remains one of South Africa's most pressing problems while at the same time there is a great need for physical infrastructure in both urban and rural areas. Concurrently there is also a lack of individual skills and institutional capacity. From a theoretical perspective, substantiated by large scale experience elsewhere in Africa (and research and development in South Africa) there are reasons for advocating the establishment of carefully formulated, long term programmes using employment-intensive methods for the construction and maintenance of the required infrastructure. These programmes have also improved institutional capacities and developed individual skills. Proper employment-intensive construction results in a significant increase in employment generated per unit of expenditure. It can be financially competitive with conventional (equipment-based) construction and can produce the same quality of product within the same time. From a development perspective there are additional socio-economic benefits to be gained such as the development of individual skills and institutional capacities and a contribution to the alleviation of poverty. The concepts and principles, taken together with the processes and results of successful long term, large scale programmes provide criteria by which to evaluate other projects and programmes. In 1994 the South African National Public Works Programme (NPWP) was launched based on the principles outlined above. This paper briefly describes the NPWP and evaluates progress in satisfying its objectives.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | development; employment; labour; skills; South Africa |
| Index terms: | socio-economic benefit, unemployment, physical infrastructure, South Africa, public work, Africa, employment, research and development, rural area, programme, poverty |
| Subjects: | regions and continents, economic analysis, management, research management, financial analysis, Geography, project controls, infrastructure engineering, sociology, infrastructure and transport systems, land use and regional development |
| Topics: | Human Resources, Cost Management, Geographical Context, Urban Studies, Business Strategy, Time Control, Research Practice, Engineering Principles, Ethics |
| Descriptive scope: | 2 PC |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here