Matrix organizational structure, culture and commitment: A Hong Kong public sector case study of change

Rowlinson, S (2001) Matrix organizational structure, culture and commitment: A Hong Kong public sector case study of change. Construction Management and Economics, 19(7), pp. 669-673. ISSN 01446193

Abstract

This paper reports on the impact of organizational change on a government department in Hong Kong. It focuses on the perceptions of professional personnel of the organizational culture developed in the department and its mismatch with their expectations. The commitment of the professionals to their organization was measured, and found to be limited solely to a level of continuance commitment. The results of the study are discussed and explained in part by reference to Hofstede's cultural concepts of power distance and individualism, and by reference to traditional Chinese cultural values.

Item Type: Article
Uncontrolled Keywords: commitment; cultural values; matrix organization; organizational change; organizational culture
Index terms: commitment, organizational structure, organizational change, personnel, organizational culture, public sector, case study, Hong Kong, mismatch
Subjects: psychology, business, engineering problems, data collection methods, sociology, administrative law, management, Geography
Topics: Legal Issues, Human Resources, Organizational Design, Research Practice, Geographical Context, Engineering Principles
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here