The construction industry as a loosely coupled system: Implications for productivity and innovation

Dubois, A and Gadde, L E (2002) The construction industry as a loosely coupled system: Implications for productivity and innovation. Construction Management and Economics, 20(7), pp. 621-631. ISSN 01446193

Abstract

Previous research suggests that the construction industry is characterized by (1) particular complexity factors owing to industry specific uncertainties and interdependences, and (2) inefficiency of operations. The aim of this study was to analyse the operations and behaviour of firms as a means of dealing with complexity. The observations made indicate that the industry as a whole is featured as a loosely coupled system. Taking this as a starting point, the couplings among activities, resources and actors were analysed in different dimensions. The pattern of couplings builds on two interdependent layers: tight couplings in individual projects and loose couplings based on collective adaptations in the permanent network. It is concluded that the pattern of couplings seems to favour short term productivity while hampering innovation and learning.

Item Type: Article
Uncontrolled Keywords: construction; innovation; loosely coupled system; productivity
Index terms: construction industry, dimension, interdependence, productivity, adaptation, coupling, complexity
Subjects: organizational analysis, industry analysis, systems engineering, management, health monitoring assessment and metrics, user focus
Topics: Design Practice, Organizational Design, Health and Safety, Business Strategy, Engineering Principles, Research Practice
Descriptive scope: 2 CT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here