Construction related factors influencing the choice of concrete floor systems

Idrus A.B, N J B (2002) Construction related factors influencing the choice of concrete floor systems. Construction Management and Economics, 20(1), pp. 13-19. ISSN 01446193

Abstract

Designers have a wide choice of concrete floor systems for their buildings. They can choose from three basic types available: in situ, precast or hybrid construction. A survey was conducted within the UK construction industry to investigate, in particular, the construction related factors influencing the choice of concrete floor systems. The data collected were subjected to frequency and severity index analyses, Kendall's concordance test and the chi-squared tests to produce a rank ordering of 12 construction related factors. Five factors were identified as being the most important, namely 'appropriateness of use', 'cost', 'constructability', 'speed' and 'health and safety'. These five factors reflect current industry emphasis, and therefore could be adopted as the principal criteria for evaluating and selecting concrete floor systems during the design stage. They could also be used as assessment criteria for developing future systems.

Item Type: Article
Uncontrolled Keywords: concrete floors; frame construction; selection factors
Index terms: design stage, health and safety, survey, in-situ, severity index, constructability, construction industry, designer
Subjects: professional practice, profession, data collection methods, building construction, environmental hazards, industry analysis, construction integration, health safety and environment
Topics: Sustainability, Roles and Professions, Engineering Principles, Research Practice, Health and Safety, Design Practice
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here