Comparison of construction costs on motorway projects using measure and value and alternative tendering initiative contractual arrangements

Langford, D A; Kennedy, P; Conlin, J and McKenzie, N (2003) Comparison of construction costs on motorway projects using measure and value and alternative tendering initiative contractual arrangements. Construction Management and Economics, 21(8), pp. 831-840. ISSN 01446193

Abstract

This paper reports the outcome of an investigation into the construction costs in 11 motorway projects. The projects formed one length of road and were of identical specification; five of the projects were undertaken by a traditional design, tender, construct method, and five were undertaken by a procurement system by which the contractor bid a lump sum for the work and so absorbed potential risks and benefits from changes in prices of resources or fluctuations in quantities of work necessary for the completion of the work. One project was undertaken by a design and build method. The results of the analysis indicate that in roadworks the construction cost per kilometre of road is some 11 % less expensive when lump sum contracts are used. This benefit appears to be more pronounced in the case of bridge structures incorporated into the motorway. Of greater significance is the cost certainty that is afforded using the lump sum methods. The research showed that lump sum projects were much more likely to be completed within the budget. Finally the lump sum methods required less management by the client organization and delivered more harmonious working relationships between the client and contractor.

Item Type: Article
Uncontrolled Keywords: construction costs; procurement; tendering; value for money; variations
Index terms: investigation, procurement system, construction cost, design and build, value-for-money, variation, client organization, specification
Subjects: client relations, data collection methods, financial and cost management, contractual arrangements, evaluation, contractual condition
Topics: Procurement, Stakeholder Management, Research Practice, Cost Management, Contract Administration, Value Management
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here