Theoretical comparison of alternative delivery systems for projects in unpredictable environments

Gil, N; Tommelein, I D and Ballard, G (2004) Theoretical comparison of alternative delivery systems for projects in unpredictable environments. Construction Management and Economics, 22(5), pp. 495-508. ISSN 01446193

Abstract

A project delivery process simulation is presented based upon empirical studies in the design-build environment of semiconductor fabrication facilities ('fabs'). The model captures key tasks and decisions in design, procurement and construction, as well as design criteria changes along the delivery of a R&D fab utility system. Simulation shows that to involve the specialty contractor from the project start on average expedites project delivery since it prevents delays caused by bidding and by contractors' unfamiliarity with the design product definition. Yet, in unpredictable project environments - environments in which design criteria are likely to change irrespectively of the project progress status simulation reveals that the averages of construction rework and waste increase if design is prematurely frozen. Assuming that work methods do not change and design criteria remain uncertain, results indicate that a system that combines early contractor involvement with judicious postponement of the design start reduces the average duration of the fab utility delivery in relation to the expected duration if competitive bidding was used, with limited increase in the averages of construction rework and waste. Additional efficiency is gained when specialty contractors relax conservative assumptions on anticipated site conditions. An economic model uses simulation results to assess the tradeoffs between alternative project delivery systems for the case of R&D fabs.

Item Type: Article
Uncontrolled Keywords: change; facility delivery compression; postponement; simulation; specialty contractor
Index terms: rework, postponement, early contractor involvement, tradeoff, process simulation, competitive bidding, compression, bidding, semiconductor, economic model, specialty contractor, efficiency, duration, fabrication, project delivery, empirical study
Subjects: project controls, decision analysis, material properties and characteristics, manufacturing engineering, management, performance management, research methods, contractual arrangements, electrical systems, professional practice, bidding, project delivery, modelling and simulation, operations management
Topics: Quality Management, Time Control, Project Management, Research Practice, Construction Materials, Engineering Principles, Business Strategy, Procurement, Risk Management
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here