Whole life appraisal of the repair and improvement work costs of post office buildings in Japan

Minami, K (2004) Whole life appraisal of the repair and improvement work costs of post office buildings in Japan. Construction Management and Economics, 22(3), pp. 311-318. ISSN 01446193

Abstract

A complete enumerative study was made of the repair and improvement work costs of the 1255 general sorting post offices throughout Japan in 2000. This paper analyses the 2000 expenditure figures from both the national enumerative survey and the survey of the five post offices being monitored for twenty years after their completion. The results show that the average annual repair work cost is 665 yen per square metre, and the average annual improvement work cost is 4231 yen per square metre, which total an average annual cost of 4896 yen per square metre. The repair and improvement work cost reaches an accumulated total of around 50 000 yen per square metre 20 years after a building has been completed, and an accumulated total of around 250 000 yen per square metre 50 years after completion. After analysing the relationship between the rebuilding cycle, and rebuilding, repair and improvement costs, by changing the present rebuilding at age 40 to building additions at age 40 and rebuilding at age 60, it became apparent that we could expect a significant reduction in facilities investment costs.

Item Type: Article
Uncontrolled Keywords: improvement; investment; post office; repair; whole life costs
Index terms: office building, survey, whole life cost, repair, appraisal, Japan, rebuilding
Subjects: Geography, construction type, maintenance engineering, financial analysis, factor and component analysis, data collection methods, building construction
Topics: Cost Management, Geographical Context, Construction Technology, Business Strategy, Engineering Principles, Research Practice
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here