Osei-Kyei, R and Chan, A P C (2019) Model for predicting the success of public-private partnership infrastructure projects in developing countries: A case of Ghana. Architectural Engineering and Design Management, 15(3), pp. 213-232. ISSN 1745-2007
Abstract
This paper develops a practical tool for predicting public–private partnership (PPP) project success in developing countries using Ghana as example. The predictive model examines the causal relationship between CSFs and success criteria for PPP projects. First, a conceptual model for PPP projects success was proposed. Second, the theoretical model was tested by means of a questionnaire survey with experienced PPP experts. Using the regression analysis technique, a predictive model for PPP project success was developed. The regression model shows three best predictors of PPP project success in Ghana, these include; appropriate risk allocation and sharing, sound economic policy and right project identification. Various statistical tests including ANOVA, tolerance and variance inflation factor (VIF), homoscedasticity and Durbin–Watson tests confirmed the validity and goodness of fit for the model. The substantive model will enable PPP practitioners including designers, public clients and engineers in Ghana and other neighbouring developing countries particularly sub-Saharan Africa to predict the likely success of their PPP projects prior to their implementations.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | critical success factors; Ghana; projects success; public–private partnerships; regression analysis; success criteria |
| Index terms: | questionnaire, practitioner, risk allocation, inflation, regression analysis, statistical test, infrastructure project, implementation, critical success factor, public client, project success, developing country, regression model, success criteria, economic policy, variance, Ghana, survey, validity, designer, partnership, engineer, Sub-Saharan Africa |
| Subjects: | Geography, development economics, financial risk, project management theory and practice, physical geography and landforms, infrastructure and transport systems, statistical analysis, partnership management, assessment methods, sociology, measurement and scaling, practitioner, control systems, data collection methods, evaluation and assessment methods, profession, contractual arrangements, business policy, economic analysis |
| Topics: | Roles and Professions, Stakeholder Management, Governance, Procurement, Cost Management, Business Strategy, Engineering Principles, Geographical Context, Project Management, Research Practice, International Construction |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here