Cheah, C Y J and Liu, J (2006) Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation. Construction Management and Economics, 24(5), pp. 545-554. ISSN 1466433X
Abstract
In Build-Operate-Transfer (BOT) infrastructure projects, host governments often provide subsidies, guarantees or alternative forms of support as incentives to attract private sector participation. A guaranteed level of minimum revenue, for example, can be specially designed to alleviate the concern of demand risk. Although researchers have generally acknowledged the significance of subsidies and guarantees leading toward successful negotiation, there is a lack of attempt to evaluate these concessions quantitatively. Without a deeper understanding of the value of these concessions, risk and reward may not be equitably matched in the proposed terms and arrangements. In this paper, relevant elements of a contractual package are treated as a form of real options. A proposition is put forward to incorporate the value of such options into the negotiation framework. By relying on simplifying assumptions on risk preferences, these options can be evaluated using Monte Carlo simulation of a discounted cash flow (DCF) model. The methodology is applied to the case of the Malaysia-Singapore Second Crossing, which shows that the value of a guarantee can indeed be significant relative to the basic net present value. The case study also highlights other aspects of flexibility in the design and execution of a project.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | build-operate-transfer; concessions; infrastructure projects; negotiation; real option |
| Index terms: | package, case study, Singapore, Malaysia, subsidy, net present value, Monte Carlo simulation, build-operate-transfer, option, negotiation, real option, infrastructure project, guarantee, demand risk, discounted cash flow, revenue, private sector participation, methodology, preference |
| Subjects: | economic analysis, contractual arrangements, modelling and simulation, stakeholder participation, data collection methods, financial analysis, infrastructure and transport systems, decision analysis, conflict resolution, financial risk, Geography, research methods, decision-making and reasoning, contract structure |
| Topics: | Engineering Principles, Research Practice, Geographical Context, Business Strategy, Cost Management, Procurement, Risk Management, Stakeholder Management |
| Descriptive scope: | 5 PCTEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here