An automated model for materials management and control

Navon, R and Berkovich, O (2006) An automated model for materials management and control. Construction Management and Economics, 24(6), pp. 635-646. ISSN 1466433X

Abstract

Current, manual, materials management and control procedures are unsatisfactory: they are labour intensive, inaccurate and error prone. The result is waste and surplus of materials, delays, decrease in productivity and lack of up-to-date, real-time information regarding the status of purchase orders (PO), the levels of inventory, the actual vs. planned usage of materials, and others. The purpose of the present work was to develop an automated model, which alleviates some of these problems. Prior to developing the model, a field survey was conducted to learn, at first hand, what the typical problems with materials management and control are. The model initiates materials purchasing, follows up the status of PO, records materials data as they arrive to the site and their movement around the site, makes recommendations, generates reports and issues warnings. The model was implemented, tested and evaluated in an ongoing building construction project. The onsite experiments confirmed that automated materials management and control are feasible, resulting in real benefits, such as time savings, and availability of up-to-date and accurate information regarding stocks of materials on site.

Item Type: Article
Uncontrolled Keywords: automation; control methods; data collection; feedback control; materials management; monitoring
Index terms: real-time information, automation, time saving, monitoring, productivity, purchasing, onsite, control method, inventory, materials management, control procedure, experiment, survey, building construction, movement
Subjects: project delivery, operations management, health behaviours and lifestyles, control systems, data collection methods, time analysis, procurement strategy, building construction, data management, inventory management, automation and robotics, monitoring and control, management
Topics: Business Strategy, Research Practice, Project Management, Procurement, Construction Technology, Digital Applications, Supply Chain Management, Time Control, Site Management
Descriptive scope: 3 PCE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here