Environmental performance assessment: Perceptions of project managers on the relationship between operational and environmental performance indicators

Tam, V W Y; Tam, C M; Shen, L Y; Zeng, S X and Ho, C M (2006) Environmental performance assessment: Perceptions of project managers on the relationship between operational and environmental performance indicators. Construction Management and Economics, 24(3), pp. 287-299. ISSN 01446193

Abstract

There is a growing concern about environmental impacts resulting from construction activities. To help minimize the environmental impacts from construction, Environmental Management Systems (EMSs) have been advocated and in some cases, implemented. Within the construction industry, Environmental Performance Assessment (EPA) forms one of the most important tools in monitoring and evaluating environmental performance. However, the relations between Environmental Operational Indicators (EOIs) (inputs) used in EPA and Environmental Performance Indicators (EPIs) (outputs) have not been tested and correlated, casting doubt on the reliability of these inputs. This paper attempts to develop a series of input (EOI) and output (EPI) indicators for EPA and measure their relations based on the perceptions of project managers. The results show that EOIs defined correlate strongly with EPIs. Therefore, EPA can help to identify areas for continuous improvement, and also provide an early indication of the environmental performance for an organization.

Item Type: Article
Uncontrolled Keywords: environmental management system; environmental performance assessment; Hong Kong; operational levels
Index terms: construction industry, monitoring, continuous improvement, construction activity, environmental performance, Hong Kong, project manager, environmental performance assessment, environmental impact, environmental management system
Subjects: control systems, environmental impact, profession, construction operations, Geography, sustainability assessment, performance measurement, industry analysis
Topics: Quality Management, Site Management, Geographical Context, Research Practice, Sustainability, Roles and Professions
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here