ALISS: Advanced linear scheduling system

Tokdemir, O B; Arditi, D and Balcik, C (2006) ALISS: Advanced linear scheduling system. Construction Management and Economics, 24(12), pp. 1253-1267. ISSN 1466433X

Abstract

The line of balance (LOB) method is not widely used in the construction industry even though it has distinct advantages in repetitive construction projects. Attempts were made in the past to develop LOB systems but no system has met with universal acceptance because of a multitude of problems. As a response, a tool named ALISS was developed that solves most of the problems associated with LOB applications. ALISS is an acronym for Advanced Linear Scheduling System and makes use of a model that utilises the tools of information technology to the fullest extent. This is accomplished by creating a system that has a standalone and a web-based version. ALISS is programmed using Visual Basic and Visual Basic Script languages. It utilises MS Access and SQL server as a data repository. The resulting Advanced Linear Scheduling System not only accommodates all LOB requirements but also provides the latest technological developments as an embedded tool.

Item Type: Article
Uncontrolled Keywords: line of balance; linear scheduling; repetitive construction
Index terms: repetitive construction, line of balance, information technology, script, linear scheduling, construction industry
Subjects: operations research, computing systems, building construction, sociology, industry analysis
Topics: Digital Applications, Time Control, Research Practice, Construction Technology
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here