Skitmore, M and Smyth, H (2007) Pricing construction work: A marketing viewpoint. Construction Management and Economics, 25(6), pp. 619-630. ISSN 1466433X
Abstract
Recent work on pricing has shown that neoclassical microeconomic theory (NCMT) is preferred to tendering theory and that implied by absorption, or full-cost, pricing of construction work because of its explicit treatment of market conditions, competitor behaviour and firm capacity levels. Applying NCMT in practice, however, requires the consideration of pricing from a marketing perspective. This paper examines the challenges involved in terms of the two prevalent marketing paradigms - marketing mix and relationship marketing - to pricing construction work generally, and the traditional contracting (TC), design and construction (D&C) and speculative building (SB) procurement systems in particular. In general, the marketing mix (MM) approach, having the closest fit with NCMT, is most aligned to current practice. However, conceptual and practical limitations are identified. Relationship marketing (RM) is theoretically more applicable, yet has been largely overlooked in practice due to the transaction costs and investment involved. Nevertheless, some RM tools are increasingly being adopted in response to demand criteria and clients' needs for continuous improvement, offering a challenge to NCMT-related pricing. In terms of specific procurement arrangements, SB would seem most suited to the MM approach over the long term as it is closest to consumer good markets. D&C on the other hand is considered to be the most price sensitive to demand factors, with SB the least because of its ability to control resources, specifically land and financial packages, while TC is most suited to developing RM practices.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | marketing; marketing mix; pricing policies; relationship marketing |
| Index terms: | markets, traditional contracting, procurement system, paradigm, pricing, land, marketing, transaction cost, construction work, design and construction, continuous improvement, market condition, package, relationship marketing |
| Subjects: | financial analysis, business, real estate economics, education and knowledge transfer, operations management, performance measurement, contractual arrangements, economic analysis, economic and policy analysis |
| Topics: | Research Practice, Project Management, Procurement, Cost Management, Urban Studies, Quality Management, Business Strategy |
| Descriptive scope: | 3 PCT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here