Negotiation-based decision support model for utility relocations in transportation infrastructure projects

Caldas, C H; Chou, C C and O'Connor, J (2008) Negotiation-based decision support model for utility relocations in transportation infrastructure projects. Construction Management and Economics, 26(10), pp. 1079-1090. ISSN 1466433X

Abstract

Highway projects in metropolitan areas often require that adjacent utilities be relocated to accommodate new or expanded highway facilities. Traditionally, utility owners have been responsible for their own relocations prior to highway construction. However, utility relocation delay was reported as one of the root causes of overall project delays in highway construction. In the USA, one strategic approach sporadically taken over the past 15 years by some state departments of transportation (DOTs) has been to combine utility relocation work with the highway contractor's scope of work. While the combined strategy offers many benefits, it does have its own set of challenges and disadvantages. Many of these difficulties involve disagreements between DOTs and utility owners over the appropriateness of the combined strategy for particular types of relocations. Hence, a negotiation-based decision support model (DSM) for determining whether to use the combined strategy was developed to provide guidance to both DOTs and utility decision makers during the planning and design phases of highways. A literature review and interviews with experts from both DOTs and the utility industry were conducted to identify significant factors as well as their impact levels on the decision. A DSM aiming at synthesizing the factors and orchestrating the negotiation process for the decision was proposed and verified. As suggested by the model evaluators, the proposed DSM can improve the quality of this complex decision-making process, especially for less experienced project managers or designers.

Item Type: Article
Uncontrolled Keywords: decision support systems; highway transportation; utilities
Index terms: negotiation, design phase, highway construction, transportation infrastructure, utilities, designer, owner, decision-making process, project manager, project delay, relocation, strategy, literature review, decision support, interview
Subjects: decision analysis, sociology, market analysis, conflict resolution, project controls, infrastructure and transport systems, civil engineering, management, professional practice, data analysis and analytics, data collection methods, profession, construction type
Topics: Roles and Professions, Stakeholder Management, Risk Management, Construction Technology, Business Strategy, Engineering Principles, Research Practice, Time Control, Design Practice
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here