Low-cost housing: A cost management model for process integration and evaluation

Obi, L; Arif, M and Goulding, J (2020) Low-cost housing: A cost management model for process integration and evaluation. Architectural Engineering and Design Management, 16(6), pp. 411-425. ISSN 1745-2007

Abstract

Effective cost management is a vital requisite for successful Low-cost housing projects (LHPs) management and delivery. Whilst several attempts have been made to develop appropriate structured models for cost management practice, many of these models are fragmented failing to capture a holistic representation of the system components or their interrelationships in LHP settings. Moreover, these models are predominantly descriptive by nature–only identifying the components of cost management and not how they can be implemented within LHP settings. This research adopts an explicit sequential mixed research design to develop a bespoke LHP cost management model for process integration and evaluation in Nigeria. This identifies the structures and interrelationships needed to conceptualise and implement cost management practice effectively. Research findings highlight eight important techniques; target costing, approximate estimating, site meetings, earned value analysis, on-site resource control, cash flow analysis, cost reporting and cost aggregation. The importance of a well-developed client brief; detailed project designs and accompanying specifications; effective project planning and supervision; and competent teams (client and contractor) to discharge responsibilities are emphasised. The importance of early contractor involvement was also seen as a core lever for success throughout the pre-design, design, and construction stages of LHP. The resulting model standardises cost management practice to provide a systematic 'blueprint' beneficial to project managers, cost managers and project management teams in evaluating and managing CMS processes more effectively in LHP settings. Hence this model can be adopted by Housing agencies as a requirement for cost management practice in LHPs settings.

Item Type: Article
Uncontrolled Keywords: cost management; low-cost housing project; performance indicators; project management team; system model
Index terms: integration, earned value analysis, agency, project planning, construction stages, estimating, housing, supervision, target costing, performance indicator, specification, project design, resource control, project manager, research design, project management team, cash flow analysis, early contractor involvement, cost manager, Nigeria, cost management, low-cost housing
Subjects: contractual arrangements, financial and cost management, project delivery, control systems, construction type, profession, research design and methodology, financial analysis, project controls, organizational analysis, housing and residential development, sociology, Geography, contractual condition, professional development, accounting and finance, performance management, economics
Topics: Cost Management, Project Management, Geographical Context, Research Practice, Information Management, Roles and Professions, Procurement, Construction Technology, Urban Studies, Quality Management, Organizational Design, Contract Administration
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here