A comparative study of factors affecting the external stakeholder management process

Olander, S and Landin, A (2008) A comparative study of factors affecting the external stakeholder management process. Construction Management and Economics, 26(6), pp. 553-561. ISSN 1466433X

Abstract

There is a natural tendency for stakeholder groups to try to influence the implementation of construction projects in line with their individual concerns and needs. This presents a challenge for construction project managers in analysing and managing these various concerns and needs in a stakeholder management process falling within the limits of the project. The aim of the research presented here was to show the factors affecting the stakeholder management process positively or negatively from the perspective of project implementation. A comparative study of two railway projects in Sweden was undertaken to analyse these factors. The study showed that the outcome of the stakeholder management process depended mainly upon how well the project managers presented the benefits and negative consequences brought on by the construction project. Techniques and tools exist for this purpose, but must be appropriate, and these are discussed in the context of the two projects. The challenge for project managers is to implement the project in such a way that the effects of negative impacts are minimized and, if possible, the benefits for all stakeholders are maximized. Project managers must communicate and interact with stakeholders so that the perceived benefits and negative impacts are realistically defined.

Item Type: Article
Uncontrolled Keywords: customer relations; railways; stakeholder; Sweden
Index terms: stakeholder management, external stakeholder, construction project, manager, customer relation, implementation, comparative study, Sweden, project manager
Subjects: contractual arrangements, participation process, practitioner, research design and methodology, profession, sociology, Geography, production management
Topics: Project Management, Geographical Context, Research Practice, Roles and Professions, Stakeholder Management, Procurement
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here