Shafiee, S; Piroozfar, P; Hvam, L; Farr, E R P; Huang, G Q; Pan, W; Kudsk, A; Rasmussen, J B and Korell, M (2020) Modularisation strategies in the AEC industry: A comparative analysis. Architectural Engineering and Design Management, 16(4), pp. 270-292. ISSN 1745-2007
Abstract
Many industries have benefited from modularisation; while in the architecture, engineering and construction (AEC) industry, the concept of modularisation is associated with dimensional coordination. This has added to an already extensive list of challenges due to market size and the concept of economies of scale in AEC industry, to name but a few. Moreover, there is a myth that the AEC industry is bound to stay associated with build-to-order or made-to-order approach caused the AEC industry to restrict modularisation to the component level. This changes the balance in favour of what this paper calls a bottom-up approach. On the other hand, a valid alternative strategy–referred to in this study as top-down strategy–remains very much underexploited. The clients, therefore, do not have a neutral means by which they can assess which strategy is in their best interest. Likewise, if a construction company plans to make a strategic move towards the principles of modularisation and off-site manufacturing, they do not have clear decision support tools. This study investigates these two main modularisation strategies in the AEC industry to provide some examples of successful cases regarding how, when and where such strategy have been applied by different construction companies in different cases. The collected and collated empirical data and the results from the interviews will help clients and companies to analyse their own cases and make operational decisions on how, when and where to best utilise the bottom-up and top-down modularisation techniques while considering the pros and cons of such decisions.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | architecture; architecture, engineering and construction; bottom-up modularisation; industrialised building systems; modularisation; top-down modularisation |
| Index terms: | interview, off-site manufacturing, decision support, industrialized building system, strategy, comparative analysis, construction company, modularization, bottom-up approach, coordination |
| Subjects: | organization, data collection methods, urban planning, data analysis and analytics, management, manufacturing engineering, building construction, decision analysis |
| Topics: | Research Practice, Engineering Principles, Business Strategy, Construction Technology, Governance, Risk Management, Organizational Design |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here