Al-Kharashi, A and Skitmore, M (2009) Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics, 27(1), pp. 3-23. ISSN 1466433X
Abstract
Many public construction projects have been undertaken throughout the Kingdom of Saudi Arabia as part of the government's national development plans in the past three decades, with significant public expenditure involved. One of the critical problems concerning these projects is the frequent and lengthy delays that occur. In order to improve the situation, it is first necessary to identify the major causes involved. Several studies have already been reported which do this but all use different sets of variables. Also, none has attempted to identify the extent to which improvements are possible in practice. A new survey is reported that uses all the variables from the previous work and measures for both current degree of effect on delays and the extent to which each can be practically improved. These are contained in seven groupings: client, contractor, consultant, materials, labour, contract and relationship-related causes. The survey covers a sample of 86 clients, contractors and consultants working in the Saudi construction industry. The analysis reveals some considerable heterogeneity between the cause groupings and respondent groupings in terms of means and correlations, apparently partly due to lack of knowledge of respondents and a tendency for the consultants to blame the contractors for the delays and vice versa. The main results, therefore, are disaggregated to reflect the views of each respondent group concerning each group of causes. In general however, it is found that the most influencing current cause of delay is the lack of qualified and experienced personnel-attributed to the considerable amount of large, innovative, construction projects and associated current undersupply of manpower in the industry.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | delays; public sector; Saudi Arabia; survey |
| Index terms: | Saudi Arabia, public expenditure, Kingdom of Saudi Arabia, public sector, causes of delay, public construction, construction industry, personnel, survey, construction project |
| Subjects: | data collection methods, management, production management, Geography, project controls, building construction, administrative law, industry analysis, political science |
| Topics: | Time Control, Legal Issues, Human Resources, Governance, Engineering Principles, Research Practice, Geographical Context, Project Management |
| Descriptive scope: | 4 PCTE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here