Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities

Ali, M M and Elazouni, A (2009) Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities. Construction Management and Economics, 27(9), pp. 839-856. ISSN 1466433X

Abstract

Projects of repetitive non-serial activities constitute a major category of construction projects which can be scheduled more conveniently using the line of balance (LOB) technique. Generally, scheduling activities such that the expenditures are always in balance with the available cash is a must to devise financially feasible schedules. The objective is to integrate a CPM/LOB model for a project of repetitive non-serial activities with a cash flow model and utilize the integrated model to devise financially feasible schedules. The genetic algorithms (GAs) technique is employed to maximize the profit at the end of the project under the constraints of available cash. The optimization of the integrated models was demonstrated using an example project of 15 activities carried out at five units. The CPM/LOB model was validated against the results of a dynamic programming model in the literature and further by conducting a sensitivity analysis of the results of the integrated model. Finally, the model offers an effective financial planning tool for projects of repetitive non-serial activities.

Item Type: Article
Uncontrolled Keywords: cash flow management; genetic algorithms; line of balance; repetitive construction; scheduling
Index terms: genetic algorithm, repetitive construction, line of balance, profit, scheduling, dynamic programming, cash flow, cash flow management, construction project, financial planning, sensitivity analysis, integrated model
Subjects: operations research, financial management, production management, economic analysis, financial and cost management, algorithms, building construction, analytical methods, environmental hazards
Topics: Project Management, Information Management, Time Control, Business Strategy, Sustainability, Digital Applications, Cost Management, Construction Technology
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here