Impact of crude oil market behaviour on unit bid prices: The evidence from the highway construction sector

Damnjanovic, I and Zhou, X (2009) Impact of crude oil market behaviour on unit bid prices: The evidence from the highway construction sector. Construction Management and Economics, 27(9), pp. 881-890. ISSN 1466433X

Abstract

It is well known that the cost of highway construction is affected by the cost of crude oil. While this relationship is highly visible for construction items such as asphalt cement (a by-product in the process of refining oil), the effects of the crude oil prices on the cost of other construction items, such as concrete cement or construction operations are less direct, but equally important. For unit-based contracts without price adjustment clauses, this relationship is of a particular significance. In fact, an increase in price of fuel could result in substantial losses, as contractors are not protected. Hence, to hedge against this risk, contractors are likely to incorporate a premium in bid prices to manage project risks. The objective of this paper is to investigate the evidence of this behaviour. New evidence shows that the expected change in oil prices (the difference between future and spot price) and the implied volatility in the oil market affect the price of bid items for contracts without price adjustment clauses. Such results allow for more effective implementation of risk management on project- and programme-level basis.

Item Type: Article
Uncontrolled Keywords: crude oil price; extreme bounds analysis; implied volatility; unit bid cost
Index terms: programme, evidence, crude oil, construction operation, implementation, highway construction, risk management
Subjects: contractual arrangements, project controls, risk assessment, environmental resource management, evaluation and assessment methods, civil engineering, construction operations
Topics: Sustainability, Procurement, Time Control, Risk Management, Research Practice, Engineering Principles, Site Management
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here