Automated trade-off between time and cost in planning repetitive construction projects

Hyari, K H; El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(8), pp. 749-761. ISSN 1466433X

Abstract

An automated model is developed to support the optimization of the planning and scheduling of repetitive construction projects. The model provides the capability of optimizing two important objectives commonly sought in scheduling repetitive construction projects: minimizing project duration; and minimizing project cost. The model performs this multi-objective optimization using a genetic algorithm approach. The output of the model is a set of optimal solutions that represent the trade-off between time and cost in planning repetitive construction projects. Furthermore, the model can be utilized to find a single scheduling solution that provides the minimum overall project cost by simply adding project indirect cost to the obtained project direct cost for each of the obtained scheduling solutions on the Pareto optimal curve. Other important time-related costs are also considered in the model including: early completion incentives, late completion penalties and lane rental costs. Providing the planners of repetitive construction projects with an automated set of optimal time-cost trade-off solutions should contribute to cost-effective and speedy delivery of this type of construction project. An application example is analysed to illustrate the use of the model and demonstrate its capabilities in generating optimal trade-off solutions between minimizing the project time and cost for repetitive construction projects.

Item Type: Article
Uncontrolled Keywords: genetic algorithms; optimization; repetitive construction; resource utilization; scheduling
Index terms: duration, time-cost trade-off, multi-objective optimization, planner, resource utilization, direct cost, indirect cost, construction project, repetitive construction, project cost, genetic algorithm, penalty, scheduling
Subjects: site logistics, operations research, profession, regulatory law, cost management, project controls, building construction, production management, quantity surveying, economics, algorithms
Topics: Risk Management, Roles and Professions, Construction Technology, Procurement, Cost Management, Project Management, Time Control, Site Management, Digital Applications, Legal Issues
Descriptive scope: 2 PC

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here