Estimating project overheads rate in bidding: DSS approach using neural networks

Chao, L C (2010) Estimating project overheads rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28(3), pp. 287-299. ISSN 1466433X

Abstract

Project overheads estimation by applying a selected rate as a percentage of direct cost is used widely in bidding in construction, but the rate is prone to inaccuracy if it is selected subjectively. An improved approach is developed, a decision support system (DSS) based on a construction firm's cost data and using a neural network model for mapping of overheads rates from project attributes. The estimating ability of the proposed DSS is continually updated by retraining the neural networks with accumulated cost data in an expanding project database. An illustrative example is provided, in which the creation and updating of a prototype neural network model were simulated using cost data for projects spanning six years. The model explains the effects of duration and direct cost on overheads rates that the regression method fails to account for. The results also give empirical evidence that the DSS is capable of improving accuracy through annual model updating and may be used as a means for implementing organizational learning. The methods for assessing the loss risk for a bid incorporating an estimate from the DSS are provided.

Item Type: Article
Uncontrolled Keywords: decision support systems; estimating; neural networks; overheads; statistical analysis
Index terms: direct cost, accuracy, estimating, construction firm, neural network, decision support, statistical analysis, estimate, bidding, database, duration, overheads, estimation, prototype, organizational learning, cost data, mapping, evidence
Subjects: modelling and simulation, spatial and geospatial analysis, data science, financial analysis, bidding, project controls, economics, artificial intelligence, accounting and finance, organization, evaluation and assessment methods, decision analysis, data management, professional development, financial and cost management
Topics: Business Strategy, Research Practice, Cost Management, Engineering Principles, Procurement, Time Control, Risk Management, Digital Applications, Information Management
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here