Bryde, D J and Schulmeister, R (2012) Applying lean principles to a building refurbishment project: Experiences of key stakeholders. Construction Management and Economics, 30(9), pp. 777-794. ISSN 1466433X
Abstract
Lean construction can be conceptualized as a process-oriented approach derived from the Toyota Production System (TPS). Elements of the approach include pull-driven scheduling, minimizing stock held on site, visual management, levelling workloads and teamwork. While there has been empirical study of Lean in relation to new-builds there is a need to analyse its applicability to other contexts, such as refurbishments. The effect of using Lean on the refurbishment of a municipal building in Germany is investigated in this study. Participant observation, archival project documentation and semi-structured interviews are used to collect data on the use of Lean. The findings indicate the difficulty of applying Lean to refurbishment projects, particularly operating pull-drive scheduling, and the experience of the project brings into question the practicalities of applying the fundamental Lean principle of having a smooth level flow of work to refurbishment projects. Minimizing stock held on site with JIT delivery of materials also proved problematic, which was exacerbated by the commercial arrangements between subcontractors and suppliers providing no incentive to Lean. The use of the visual management aspects of Lean, such as performance charts, coupled with weekly meetings, were easier to adapt to the project and generally had a beneficial impact.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | Germany; lean construction; refurbishments; stakeholders |
| Index terms: | workload, lean construction, observation, interview, scheduling, production system, subcontractor, Germany, project documentation, building refurbishment, visual management, teamwork, refurbishment project, empirical study |
| Subjects: | operations research, project planning, data collection methods, practitioner, asset management, building construction, research methods, management, manufacturing engineering, infrastructure engineering, Geography |
| Topics: | Business Strategy, Research Practice, Project Management, Geographical Context, Engineering Principles, Roles and Professions, Human Resources, Time Control, Site Management, Organizational Design |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here