Establishing the association between collaborative working and construction project performance based on client and contractor perceptions

Greenwood, D and Wu, S (2012) Establishing the association between collaborative working and construction project performance based on client and contractor perceptions. Construction Management and Economics, 30(4), pp. 299-308. ISSN 1466433X

Abstract

The assumption that forms of collaborative working (for example, partnering) can have a substantial beneficial impact on project performance underlies many of the proposed reform agendas in the UK construction sector. The majority of supporting evidence is, however, either anecdotal or limited to individual cases. This shortfall is addressed and aspects of project performance are evaluated relative to different degrees of collaborative working. To achieve this, project performance and collaborative working were first analysed into identified constituents. For clarity, these were referred to as attributes (of collaborative working) and indicators (in the case of project performance). This permitted the operationalization of the two concepts into a more measurable format. Data from 44 projects were evaluated. The results indicate a positive linear relationship between collaborative working and project performance. Further, by seeking associations between these disaggregated attributes (of collaborative working) and indicators (of project performance) a richer picture emerged of how the association between the two headline concepts might possibly be explained. Aside from its theoretical contribution, the work has a practical implication in terms of how project performance might be improved.

Item Type: Article
Uncontrolled Keywords: collaboration; modelling; project performance
Index terms: performance-based, construction sector, evidence, construction project, collaboration, partnering, modelling, project performance
Subjects: industry analysis, partnership management, project management theory and practice, production management, performance measurement, management, analytical methods, evaluation and assessment methods
Topics: Stakeholder Management, Project Management, Research Practice, Engineering Principles, Organizational Design, Quality Management
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here