Achieving ambidexterity in large, complex engineering projects: A case study of the sutong bridge project

Liu, L; Wang, X and Sheng, Z (2012) Achieving ambidexterity in large, complex engineering projects: A case study of the sutong bridge project. Construction Management and Economics, 30(5), pp. 399-409. ISSN 1466433X

Abstract

Complex engineering projects typically face unique challenges that demand both exploring innovative solutions and exploiting existing capabilities. However, it is difficult to manage both exploitation and exploration in the same organizational unit owing to the different organizational support required for each. The solutions to managing the tension involve separating the two approaches into separate organizational units-structural separation, or separating by time-temporal separation, or by creating an organizational context that empowers employees to pursue both. Structural separation may not work because of the predominant need for integration at project level due to the fragmented nature of the construction industry and the co-location of project team. Instead, temporal separation could be an effective mechanism of separation. Creating the appropriate project context could facilitate project ambidexterity. Extant studies on ambidexterity focus on the organizational level which may not apply at project level. This study examines the effects of the above three antecedents to project ambidexterity. The key findings are that ambidexterity can be achieved during the limited lifespan of a complex engineering project through: (1) partitioning the two approaches in different project phases and then integrating the two; (2) implementing policies and financial support aiming at facilitating contextual ambidexterity both at and above project level.

Item Type: Article
Uncontrolled Keywords: ambidexterity; exploitation; exploration; innovation; uncertainty
Index terms: integration, exploration, ambidexterity, lifespan, face, co-location, project team, construction industry, bridge project, case study, exploitation
Subjects: management, industry analysis, infrastructure and transport systems, organizational analysis, strategic management, data collection methods, material degradation and durability, project delivery, psychology, operations management, environmental resource management
Topics: Site Management, Organizational Design, Project Management, Research Practice, Construction Materials, Engineering Principles, Business Strategy, Sustainability
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here