Yeung, D and Skitmore, M (2012) A method for systematically pooling data in very early stage construction price forecasting. Construction Management and Economics, 30(11), pp. 929-939. ISSN 1466433X
Abstract
Client owners usually need an estimate or forecast of their likely building costs in advance of detailed design in order to confirm the financial feasibility of their projects. Because of their timing in the project life cycle, these early stage forecasts are characterized by the minimal amount of information available concerning the new (target) project to the point that often only its size and type are known. One approach is to use the mean contract sum of a sample, or base group, of previous projects of a similar type and size to the project for which the estimate is needed. Bernoulli's law of large numbers implies that this base group should be as large as possible. However, increasing the size of the base group inevitably involves including projects that are less and less similar to the target project. Deciding on the optimal number of base group projects is known as the homogeneity or pooling problem. A method of solving the homogeneity problem is described involving the use of closed form equations to compare three different sampling arrangements of previous projects for their simulated forecasting ability by a cross-validation method, where a series of targets are extracted, with replacement, from the groups and compared with the mean value of the projects in the base groups. The procedure is then demonstrated with 450 Hong Kong projects (with different project types: Residential, Commercial centre, Car parking, Social community centre, School, Office, Hotel, Industrial, University and Hospital) clustered into base groups according to their type and size.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | closed form equations; cross-validation; data pooling; early stage estimating; homogeneity |
| Index terms: | hotel, replacement, forecasting, estimating, validation, sampling, estimate, Hong Kong, owner, life cycle |
| Subjects: | sociology, data collection methods, value management, prediction and forecasting, professional development, financial and cost management, materials science, construction type, Geography |
| Topics: | Geographical Context, Project Management, Research Practice, Stakeholder Management, Information Management, Cost Management, Construction Technology, Engineering Principles |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here