Demian, P and Walters, D (2014) The advantages of information management through building information modelling. Construction Management and Economics, 32(12), pp. 1153-1165. ISSN 01446193
Abstract
As building information modelling (BIM) is positioned by governments and construction professionals as a solution to the problems in the construction industry, research is needed into the benefits BIM actually confers. The focus here is on the effectiveness of BIM as a medium for communicating information within a construction team. A case study of an offsite precast concrete fabrication facility was conducted. At the time of the study, the facility was supplying precast units for four public sector projects, and using four information management systems: e-mail, a construction project extranet tool, an Enterprise Resource Planning system and a new BIM-based system. The flow of information through the four media was measured and visualized as the projects progressed. This quantitative measurement of information flow was combined with qualitative data from interviews with facility staff. It was found that the introduction of the BIM-based system diverted information flow through the building model and away from the extranet system. The use of e-mail was largely unaffected. BIM allowed considerably more accurate, on-time and appropriate exchange of information. It is concluded it is possible to quantify some of the benefits of BIM to information management. This research paves the way for future research into the management of more construction project information linked more closely to building models.,
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | building information modelling; construction information; information management |
| Index terms: | building information modelling, precast concrete, construction professional, construction team, fabrication, management system, enterprise resource planning, public sector, interview, information flow, construction project, case study, media, construction industry, effectiveness, e-mail |
| Subjects: | management, information systems, building materials, performance management, data collection methods, professional development, communication, manufacturing engineering, project delivery, industry analysis, sociology, production management, computer science, administrative law |
| Topics: | Engineering Principles, Legal Issues, Construction Materials, Research Practice, Project Management, Quality Management, Digital Applications, Organizational Design, Information Management |
| Descriptive scope: | 4 PCTE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here