Alananga, S; Lucian, C and Kusiluka, M M (2015) Significant cost-push factors in owner-built incremental housing construction in Tanzania. Construction Management and Economics, 33(8), pp. 671-688. ISSN 01446193
Abstract
The owner-built incremental housing approach is highly prevalent in developing countries although its economic rationale is questionable. This study uses descriptive statistics and regression analysis to examine the flexibility of owner-built housing construction cost in response to different cost-push factors based on survey data on 43 main and 20 outbuilding projects implemented in Dar es Salaam Tanzania between 1990 and 2013. It has been observed that factor cost-flexibility of incremental construction is significantly enhanced through longer construction periods, the use of local cement and drainage system materials and larger built space. This flexibility is explained by the owner-builders' ability to internalize these cost-push factors over time which is reflected through lower annual construction costs facing owner-builders even at times of shortage in services and material supply, cost underestimation or high interest rate. These observations suggest that longer construction periods not only offer the cost-spread advantage but also allow a more thorough search for appropriate plot location, cheaper sources of materials, more affordable design and an appropriate match between changing life cycle housing needs and household income. Therefore, the incremental owner-built approach has lower annual construction costs not only because of the cost-spread effect of a longer construction period but also as a result of owner-builders' cost-saving choices made in terms of utilization of certain local materials, purchasing plots in less challenging environments, preferring single-storey over two-storey houses and avoiding complex house design.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | construction cost; developing countries; duration; housing; Tanzania |
| Index terms: | developing country, owner-built housing, survey, builder, interest rate, housing need, drainage, housing, Tanzania, purchasing, owner, life cycle, construction cost, local material, income, household, residential construction, duration, house design, Dar es Salaam, incremental construction, statistics, regression analysis |
| Subjects: | financial and cost management, economic analysis, building materials, practitioner, value management, data collection methods, construction type, mathematical modelling, infrastructure and transport systems, procurement strategy, statistical analysis, housing and residential development, demography, project controls, building construction, sociology, Geography, development economics, design process, economic development, construction integration |
| Topics: | Design Practice, Urban Studies, International Construction, Time Control, Business Strategy, Cost Management, Geographical Context, Project Management, Research Practice, Construction Materials, Engineering Principles, Roles and Professions, Stakeholder Management, Procurement, Construction Technology |
| Descriptive scope: | 4 PCEA |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here