Boyd, P; Larsen, G D and Schweber, L (2015) The co-development of technology and new buildings: Incorporating building integrated photovoltaics. Construction Management and Economics, 33(5-6), pp. 349-360. ISSN 01446193
Abstract
Current approaches for the reduction of carbon emissions in buildings are often predicated on the integration of renewable technologies into building projects. Building integrated photovoltaics (BIPV) is one of these technologies and brings its own set of challenges and problems with a resulting mutual articulation of this technology and the building. A Social Construction of Technology (SCOT) approach explores how negotiations between informal groups of project actors with shared interests shape the ongoing specification of both BIPV and the building. Six main groups with different interests were found to be involved in the introduction of BIPV (Cost Watchers, Design Aesthetes, Green Guardians, Design Optimizers, Generation Maximizers and Users). Their involvement around three sets of issues (design changes from lack of familiarity with the technology, misunderstandings from unfamiliar interdependencies of trades and the effects of standard firm procedure) is followed. Findings underline how BIPV requires a level of integration that typically spans different work packages and how standard contractual structures inhibit the smooth incorporation of BIPV. Successful implementation is marked by ongoing (re-)design of both the building and the technology as informal fluid groups of project actors with shared interests address the succession of problems which arise in the process of implementation.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | building integrated photovoltaics; carbon reduction; innovation; project; social construction of technology |
| Index terms: | social construction of technology, design change, carbon reduction, photovoltaic, implementation, renewable technology, integration, negotiation, package, specification, carbon emission |
| Subjects: | sociology, sustainable design, conflict resolution, contractual arrangements, energy systems, contractual condition, organizational analysis, climate science |
| Topics: | Contract Administration, Organizational Design, Stakeholder Management, Research Practice, Sustainability, Procurement |
| Descriptive scope: | 3 PCT |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here