An alternative classification of project delivery methods used in the United States building construction industry

Franz, B W and Leicht, R M (2016) An alternative classification of project delivery methods used in the United States building construction industry. Construction Management and Economics, 34(3), pp. 160-173. ISSN 01446193

Abstract

Although many sources describe the project delivery methods available to owners, there is little empirical data on their defining characteristics. The objective of this research was to examine patterns in contract arrangements, procurement practices and compensation terms used in the US building construction industry. Survey data were collected for projects completed between 2008 and 2013 (N = 204) from owners and contractors belonging to large US professional organizations. A latent class analysis was used to identify five distinct patterns or 'classes' based upon eight characteristics of the project delivery process. These classes were defined as: (I) late builder and trade involvement, with an open, cost-based selection and lump sum contract (9% of projects in sample); (II) late builder and trade involvement, with a prequalified, cost-based selection and lump sum contract (19%); (III) early builder and late trade involvement, with a prequalified non-cost based selection and guaranteed maximum price (GMP) contract (26%); (IV) early builder and trade involvement, with a prequalified, cost-based selection and lump sum design-build (DB) contract (27%); (V) early builder and trade involvement, with a prequalified, non-cost based selection and GMP DB contract (18%). Compared to existing classifications of project delivery methods, these classes are data-driven typologies that represent how participants are procured and organized into a project team. The findings have implications as an alternative classification system in project delivery research and as guidance to owners considering their project delivery options.

Item Type: Article
Uncontrolled Keywords: early contractor involvement; integrated project delivery; latent class analysis; typology
Index terms: project team, early contractor involvement, integrated project delivery, United States, contract arrangement, option, project delivery, owner, survey, building construction, latent class analysis, compensation, builder
Subjects: data collection methods, contractual arrangements, dispute resolution, practitioner, building construction, sociology, Geography, decision analysis, project delivery, statistical analysis
Topics: Construction Technology, Roles and Professions, Legal Issues, Procurement, Stakeholder Management, Project Management, Geographical Context, Research Practice, Risk Management
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here