Estimation models for heating energy and electricity costs

Lasshof, B and Stoy, C (2016) Estimation models for heating energy and electricity costs. Construction Management and Economics, 34(9), pp. 622-640. ISSN 01446193

Abstract

Heating energy and electricity represent a significant proportion of the overall financial expenditures over the life cycle of buildings and play a decisive role in the assessment of ecological quality. To ensure ecological and economical sustainability, the planning and construction of energy efficient buildings have become increasingly important. The present study introduces statistical models for the estimation of energy costs during the planning process as well as for the purpose of monitoring and controlling costs during operation including a wide range of facility types. Based on a data sample of 206 occupied facilities located in Germany, regression models are presented in detail including significant predictor variables. The provision of correctly specified models as well as a consistent and unbiased estimation beyond the employed data is verified by validation tests. The practical significance of the determined variables is presented by the calculation of various scenarios. The best estimation accuracy is indicated for regression models with transformed response and predictor variables achieving mean absolute percentage errors of 20.5% (heating energy) and 20.7% (electricity), respectively. An extension of the data sample, a consideration of further facility types, and an implementation of additional statistical methods may be considered by future approaches to improve the estimation accuracy.

Item Type: Article
Uncontrolled Keywords: cost estimation; energy costs; life cycle costs; regression analysis; running costs
Index terms: accuracy, life cycle cost, energy cost, cost estimating, validation, Germany, life cycle, estimation, planning process, regression model, energy-efficient building, statistical model, implementation, regression analysis, monitoring, statistical method, running cost
Subjects: value management, control systems, financial and cost management, contractual arrangements, data science, professional development, sustainable design, Geography, research methods, statistical analysis, cost management, project controls
Topics: Site Management, Time Control, Sustainability, Procurement, Cost Management, Information Management, Project Management, Geographical Context, Research Practice
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here