A multi-objective construction site layout planning problem solved through integration of location and traffic assignment models

Hammad, A W A (2020) A multi-objective construction site layout planning problem solved through integration of location and traffic assignment models. Construction Management and Economics, 38(8), pp. 756-772. ISSN 01446193

Abstract

Effective construction site layout planning is imperative for ensuring the productivity and safety of construction operations during the various phases of a project. Contrary to previous studies where the focus has been merely on the location decisions of operating facilities, this study examines the site layout planning problem from the perspective of incorporating planning considerations for on-land traffic assignment on site. The site layout planning problem is thus solved by accounting for location decisions, on-land material handling equipment choices, and traffic assignment on the site’s ground during construction. A sustainable site layout is ensured through minimizing noise pollution measured at noise-sensitive receivers located around the construction site, minimizing the cost of the layout adopted, as well as minimizing the total travel time of on-land equipment traversing between the positioned temporary facilities. The problem is initially formulated as a bi-level model and then later reformulated into a single-level model based on a justified relaxation. To handle the multi-objective nature of the resulting problem, the augmented (Formula presented.) -constraint approach is utilized to generate the non-dominated Pareto front. Applied to a realistic case, the results of the proposed bi-level model demonstrate that errors of up to 55% in total system travel time can be avoided when traffic assignment on-site is considered.

Item Type: Article
Uncontrolled Keywords: bi-level modelling; construction site traffic planning; mixed integer programming; multi-objective optimization; noise pollution; site layout planning
Index terms: productivity, construction operation, modelling, land, site layout planning, multi-objective optimization, construction site, mixed integer, noise pollution, site layout, accounting, material handling, integration, programming
Subjects: management, algorithms, organizational analysis, environmental health, mathematical modelling, programming, work location, real estate economics, product delivery, construction operations, analytical methods, site logistics, economic analysis, construction planning
Topics: Business Strategy, Research Practice, Engineering Principles, Sustainability, Digital Applications, Urban Studies, Supply Chain Management, Organizational Design, Site Management
Descriptive scope: 3 PCA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here