Khalef, R; Ali, G G; El-adaway, I H and Gad, G M (2022) Managing construction projects impacted by the COVID-19 pandemic: A contractual perspective. Construction Management and Economics, 40(4), pp. 313-330. ISSN 01446193
Abstract
The Coronavirus Disease (COVID-19) had severe, unforeseen, and prolonged implications on construction projects as well as many other industries. This resulted in severe effect on the supply of material, manufacturing, availability of human resources, and other factors which collectively negatively affected construction processes. To this end, there is a lack of comprehensive studies and understanding concerning that the contractual implications and remedies associated with the COVID-19 pandemic. This paper addresses this knowledge gap. The authors utilise a multi-step research methodology that comprised: (1) studying the contractual interpretation of COVID-19 under the American Institute of Architects (AIA) A-201-2017 as a widely used standard form of contract in the United States; (2) determining the associated contractual remedies for COVID-19; (3) comparing how the aforementioned two issues are handled under the Federation of International Construction Engineers (FIDIC) Red Book 2017, as being a much utilised international standard form of contract that is adopted by the World Bank; (4) developing guidelines and recommendations to be used by owners, contractors, project managers, and contract administrators in planning, handling, and mitigating the contractual implications of the current pandemic; (5) investigating the applicable legal doctrines and principles; and (6) solidifying the research steps and overall research outcomes using the input of legal experts who also helped investigate the relevant common law legal principles that could be associated with COVID-19. The results of this research should promote effective and efficient project management practices under the current new normal and similar interrelated conditions.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | COVID-19; FIDIC; international construction; manufacturing; United States; construction project; project management practice; architect; owner; project manager |
| Index terms: | research methodology, international construction, architect, coronavirus, project manager, pandemic, World Bank, standard form of contract, FIDIC, owner, engineer, construction project, human resource, construction process, project management practice, contract administrator, COVID-19, United States |
| Subjects: | sociology, building construction, health conditions and diseases, project management theory and practice, Geography, production management, management, health risk and incident analysis, institutional frameworks, contractual arrangements, practitioner, research design and methodology, standard forms of contract, profession, strategic management |
| Topics: | Research Practice, Project Management, Geographical Context, Health and Safety, Procurement, Governance, Roles and Professions, Stakeholder Management, Human Resources, International Construction, Site Management |
| Descriptive scope: | 2 PC |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here