An integrated game-theoretic and reinforcement learning modeling for multi-stage construction and infrastructure bidding

Ahmed, M O and El-adaway, I H (2023) An integrated game-theoretic and reinforcement learning modeling for multi-stage construction and infrastructure bidding. Construction Management and Economics, 41(3), pp. 183-207. ISSN 01446193

Abstract

Construction and infrastructure bidding is a highly competitive and complicated process that entails various uncertainties faced by contractors. The situation is more complex in multi-stage bidding (MSG) where general contractors must deal with the complexity of accounting for the bids of their subcontractors and face a greater threat of falling prey to the winner’s curse (i.e. situation where the winning contractor underestimates the actual cost of the project). Existing research efforts have tackled the issue of the winner’s curse in MSG from the general contractor’s perspective. However, there is a lack of research in developing bidding models that simultaneously aid both general contractors and subcontractors in determining their bid value to mitigate the winner’s curse in MSG. This paper fills this knowledge gap. The authors utilized an interdependent game theory (GT) and reinforcement learning (RL) approach, that includes: formulation of MSG framework; incorporation of two RL algorithms, namely the multiplicative weights and the modified Roth-Erev, to be utilized by subcontractors in preparation of their bids; utilization of MSG game-theoretic bid function for the preparation of the general contractors' bids for the whole project; development of the MSG-GTRL model; and testing the MSG-GTRL model through simulating various bidding scenarios using a combination of actual and synthetic dataset of infrastructure projects. Results show that integrating GT and RL in MSG bidding enables general contractors and their subcontractors to simultaneously improve their financial state by minimizing the occurrence of negative earnings, and thus, avoiding the winner’s curse in their respective portions of projects.

Item Type: Article
Uncontrolled Keywords: construction bidding; cost estimation; game theory; general contractor; reinforcement learning; subcontractor; winner's curse
Index terms: infrastructure project, modelling, testing, reinforcement, game theory, face, general contractor, cost estimating, actual cost, subcontractor, bidding, complexity, dataset, accounting
Subjects: systems engineering, infrastructure and transport systems, data management, financial and cost management, analytical methods, economic analysis, decision models, professional practice, bidding, building materials, psychology, practitioner
Topics: Digital Applications, Organizational Design, Cost Management, Business Strategy, Research Practice, Engineering Principles, Construction Materials, Roles and Professions, Procurement
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here