Slack in production planning and control: A study in the construction industry

Fireman, M C T; Saurin, T A; Formoso, C T; Koskela, L and Tommelein, I D (2023) Slack in production planning and control: A study in the construction industry. Construction Management and Economics, 41(3), pp. 256-276. ISSN 01446193

Abstract

Although buffers of inventories, time, and capacity are commonly recommended to mitigate variability in construction, they abstract away the role played by human agency. This study argues for slack as a socio-technical complement to buffers for dealing with variability. The investigation is based on two case studies conducted in construction projects that adopted the Last Planner® System. Data collection focussed on understanding how slack practices and resources (SPR) were used in production planning and control, and was based on observations, analysis of documents, and interviews. Findings revealed 57 instantiations of slack practices and 8 types of slack resources. Several of these SPR diverge from what are traditionally called buffers, highlighting how the concept of SPR gives visibility to a wider range of variability coping mechanisms. Thus, it is important to make SPR explicit so that managers can reflect on why SPR are necessary, understand how they relate to each other, and assess their unintended consequences. Five propositions are presented, encompassing: how to identify SPR; the variety and general- or context-specific nature of SPR; and the value of maintaining SPR. These propositions contribute to risk management in production planning and control.

Item Type: Article
Uncontrolled Keywords: buffers; last planner<sup>®</sup>; production planning and control; slack; variability
Index terms: socio-technical, case study, inventory, variability, construction industry, buffer, investigation, risk management, planner, coping, production planning, slack, unintended consequence, manager, interview, agency, documents, construction project
Subjects: practitioner, profession, risk assessment, data collection methods, project delivery, operations research, financial risk, professional development, inventory management, production management, research methods, statistical analysis, behavioral psychology, industry analysis, sociology
Topics: Time Control, Supply Chain Management, Roles and Professions, Risk Management, Information Management, Engineering Principles, Project Management, Research Practice, Cost Management
Descriptive scope: 5 PCTEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here