An evaluation of clients' needs and responsibilities in the construction process

Kometa, S T; Olomolaiye, P O and Harris, F C (1995) An evaluation of clients' needs and responsibilities in the construction process. Engineering, Construction and Architectural Management, 2(1), pp. 57-76. ISSN 0969-9988

Abstract

The importance of clients' responsibilities in the construction process, as perceived by both clients and consultants, was assessed through a structured questionnaire survey. Using the relative index ranking technique, clients' fundamental needs and responsibilities in the construction process were analysed and ranked. Results indicate that the four most important needs are: functionality of the building, safety of the building, quality of the building, and completion time. The four most important clients' responsibilities identified by clients themselves are: planning/design, project finance, project implementation/management, and project definition/formuiation. The four most important clients' responsibilities to project consultants are: project finance, project definition/formulation, planning/design, and project implementation/management. If both consultants and clients understand the fundamental needs of construction clients and if clients themselves are prepared to take an active role in the construction process, the chances of producing more successful projects will improve.

Item Type: Article
Uncontrolled Keywords: client needs; client responsibility; consultant; project management; success factor
Index terms: construction client, project management, implementation, success factor, survey, functionality, project finance, questionnaire, completion time, construction process
Subjects: design features, contractual arrangements, health monitoring assessment and metrics, data collection methods, practitioner, project controls, building construction, financial management, project management theory and practice
Topics: Time Control, Site Management, Design Practice, Procurement, Roles and Professions, Research Practice, Project Management, Health and Safety, Cost Management
Descriptive scope: 4 PCEA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here