Causes of delay in the construction industry in Lebanon

Mezher, T M and Tawil, W (1998) Causes of delay in the construction industry in Lebanon. Engineering, Construction and Architectural Management, 5(3), pp. 252-260. ISSN 0969-9988

Abstract

The present paper presents the major causes of delays in the construction industry in Lebanon and the relative importance of these postponements. A survey of a randomly selected sample of 11 owners, 15 contractors and 10 architectural/engineering (A/E) firms from Lebanon was undertaken. The survey included 64 causes of delay, grouped into 10 major groups, in which the participants were asked to indicate their level of importance of each delay. The level of importance of the causes and the groups were measured and ranked by the importance index for owners, contractors and A/E firms. It was found that all three parties generally agreed on the ranking of the major categories of delay factors. Owners had more concerns with regard to financial issues, while contractors ranked contractual relationships highest, and finally, A/E firms ranked project management highest.

Item Type: Article
Uncontrolled Keywords: claim; delay; Lebanon; project management; schedule; time
Index terms: relative importance, postponement, survey, contractual relationship, Lebanon, owner, causes of delay, construction industry, project management
Subjects: contractual relationship, risk assessment, data collection methods, project management theory and practice, Geography, sociology, project controls, industry analysis
Topics: Risk Management, Stakeholder Management, Research Practice, Project Management, Geographical Context, Time Control, Contract Administration
Descriptive scope: 4 PCTE

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here