An application of case-based reasoning to the planning of highway bridge construction

Tah, J H M; Carr, V and Howes, R (1998) An application of case-based reasoning to the planning of highway bridge construction. Engineering, Construction and Architectural Management, 5(4), pp. 327-338. ISSN 0969-9988

Abstract

Previous approaches to decision support for project planning using rule-based expert systems techniques have failed to make an impact in practice. This is primarily because of the complexity and large-scale nature of construction information, and problems with expert systems including: knowledge acquisition; rule-based knowledge representation; information storage (or memory); learning; and robustness. Case-based reasoning is one area of current research which may hold the key to overcoming a number of these problems. In the present paper, previous related case-based reasoning work is examined. The key factors which influence the formulation of construction project plans are identified. This knowledge is used to develop a conceptual framework within which previous planning experiences can be captured and reused in new situations as a means of providing system decision support in construction planning and control. A prototype system, CBRidge, developed to test and demonstrate the concepts within the framework is presented. The results are very encouraging and provide a sound basis for the further development of case-based reasoning for construction planning in practice.

Item Type: Article
Uncontrolled Keywords: bridge; case-based reasoning; control; planning; decision support; knowledge-based system
Index terms: knowledge-based system, construction planning, knowledge acquisition, prototype, case-based reasoning, decision support, bridge construction, conceptual framework, complexity, project planning, construction project, expert system
Subjects: decision analysis, cognitive psychology, data management, systems engineering, student development, theoretical framing, infrastructure engineering, production management, modelling and simulation, construction planning, artificial intelligence, control systems
Topics: Education, Site Management, Digital Applications, Risk Management, Engineering Principles, Research Practice, Project Management
Descriptive scope: 4 PCTA

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here