Integrated models for construction planning: Object flow and relationship

Alshawi, M and Hassan, Z (1999) Integrated models for construction planning: Object flow and relationship. Engineering, Construction and Architectural Management, 6(2), pp. 197-212. ISSN 0969-9988

Abstract

Sharing and exchanging information between project participants are basic requirements for developing construction plans. An isolated construction planning knowledge-based system is no more useful and beneficial than any another island of automation' unless the integration with other construction applications are addressed. This paper proposes conceptual data and process models for a construction planning system, CONPLAN (Intelligent CONstruction PLANning), which works within a fully Integrated Construction Environment (ICE). An object oriented methodology (James Martin) has been used to establish generic construction models within which other construction applications can be integrated. This paper also introduces briefly the modularized approach that has been adopted to integrate the various construction applications over the project life cycle.

Item Type: Article
Uncontrolled Keywords: building life cycle; conceptual model; construction planning; data and process model; integrated construction environment
Index terms: automation, construction planning, knowledge-based system, life cycle, building life cycle, integrated model, methodology, integration
Subjects: value management, artificial intelligence, construction planning, analytical methods, research methods, automation and robotics, organizational analysis, asset management
Topics: Business Strategy, Information Management, Project Management, Research Practice, Organizational Design, Site Management, Digital Applications
Descriptive scope: 3 PCT

N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here