Love, P E D; Smith, J; Treloar, G J and Li, H (2000) Some empirical observations of service quality in construction. Engineering, Construction and Architectural Management, 7(2), pp. 191-201. ISSN 0969-9988
Abstract
Architectural and engineering firms (design firms) have eschewed implementing quality assurance (QA) and other subsequent aspects of quality such as continuous improvement. Their reluctance to embrace QA has been found to be a contributing factor in the production of poor quality contract documentation. Missing, conflicting and erroneous information contained within contract documentation are major sources of rework and customer dissatisfaction in construction projects. If design firms are to significantly improve the quality of the service they provide, they should implement ISO 9000 quality management and assurance standards. By implementing such standards, it is suggested that design firms will be able to contribute more effectively to the value adding process in the construction supply chain. It is argued that the service offered by design firms should be viewed as a key component of value that drives its success. Therefore, because rework is a major source of dissatisfaction in projects, a case study was used to determine how its occurrence inhibited value creation and thus the quality of service provided. From the case study findings, the need for design firms to implement ISO 9000 quality management and assurance standards so as to improve their service quality is discussed.
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | design firms; ISO 9000 standards; rework; service quality; time boxing; value |
| Index terms: | contract documentation, quality management, engineering firm, quality assurance, value creation, construction supply chain, quality of service, rework, ISO, construction project, case study, continuous improvement, design firm, service quality |
| Subjects: | production management, economic development, quality assurance, operations management, practitioner, firms, data collection methods, performance measurement, construction logistics, public and environmental health, contractual arrangements, standards development |
| Topics: | Research Practice, Sustainability, Roles and Professions, Procurement, Project Management, Health and Safety, Supply Chain Management, Quality Management |
| Descriptive scope: | 3 PCE |
N.B. Descriptive scope is a count of how many of the five facets of empirical research are indicated by the words used in title, abstract and keywords. It is not intended as a judgement on the research; merely a count of the kind of word we would expect to indicate Phenomenon, Concepts, Theoretical framing, Empirical techniques, Analytical techniques. If all five are present, then a code of “5 PCTEA” will indicate this. If you feel the coding for this record is questionable, we welcome discussion around the terms we matched or the way we categorized them. The facet you would expect may not be coded, or a facet may be coded inappropriately. This can also bear on a larger question, of which facets should be treated as defining in construction management research. Please get in touch, and we will look at it. More details here